GAS FIRED POWER PLANT
The Java-1 IPP project is a project that integrates gas facilities with a power plant project consisting of a 1,760 MW PLTGU, FSRU, gas pipelines between PLTGU and FSRU, and a transmission line connecting PLTGU with interconnection points.
PThe Java-1 IPP project is a project that integrates gas facilities with a power plant project consisting of a 1,760 MW PLTGU, FSRU, gas pipelines between PLTGU and FSRU, and a transmission line connecting PLTGU with interconnection points. LNG supplied by PLN will be received and regasified at the FSRU unit and then flowed in the form of gas to the Java-1 PLTGU unit through offshore and onshore gas pipelines. Furthermore, the electricity produced by the Java-1 PLTGU will be distributed to PLN for 25 years with a BOOT (Build, Own, Operate, and Transfer) scheme to the Java-Bali electricity system through a 500 kV transmission network from the generator site to PLN's 500 kV substation. IPP Jawa-1 will sell electrical energy to PLN with a PPA (Power Purchase Agreement). LNG supply for the Java-1 IPP project is the responsibility of PLN. LNG comes from the Tangguh LNG plant based on the LNG Sale Purchase Agreement (SPA) between PLN and Tangguh.
Jawa-1 Profile
Powerplant
- Perusahaan
- PT Jawa Satu Power
- Kepemilikan
- PPI 40%, Marubeni 40%, Sojitz 20%
- Lokasi Proyek
- Cilamaya, Jawa Barat
- Kapasitas
- 1,760 MW
- Nilai Proyek
- Kurang lebih 1.4 Milyar USD
- Tanggal Operasi
- Desember 2021
- Pembeli
- PLN
- Periode Kontrak
- 25 Tahun
Profil Jawa-1 FSRU
- Perusahaan
- PT Jawa Satu Regas
- Kepemilikan
- PPI 26%, Humpuss 25%, Marubeni 20%, Mitsui O.S.K. Lines, Ltd 19%, Sojitz 10%
- Kapasitas
- 170.000 m3
- Nilai Proyek
- Kurang lebih 0.4 Milyar USD
Infografis PLTGU JAWA-1